# Vendor Outreach — Solar Installers (Ballia / Varanasi region)

## How to find the right installers (get at least 3 quotes)

Target **MNRE / UPNEDA-empanelled** solar installers, and prefer ones who have done **motor / industrial loads** (not just home rooftops — a sawmill's motor surge is different from a house). Sources:
1. **UPNEDA empanelled vendor list** — search "UPNEDA empanelled solar vendor Ballia / Azamgarh / Varanasi".
2. **PM Surya Ghar / national portal vendor directory** — even though the subsidy doesn't apply to you, the *vendors* listed there are vetted installers.
3. **Local industrial electrical contractors in Ballia/Varanasi** who do 3-phase motor + panel work — many now also do solar.
4. Ask the **inverter brands directly** (Deye / Growatt / Sungrow / Luminous / Waaree / Tata Power Solar) for their authorised dealer near Ballia.

> Aim for a mix: 1–2 bigger brand-channel installers + 1 strong local industrial electrician. Make **net-metering paperwork their job** (it's in the RFQ).

## WhatsApp / phone intro message (Hinglish — send with the RFQ)

```
Namaste 🙏
Hamare Reoti (Ballia) me ek aara machine (sawmill) hai, abhi 2 diesel engine
(25 HP + 15 HP) se chalti hai — roughly ₹2000/din diesel kharch hota hai.
Hum ise SOLAR-HYBRID par convert karna chahte hain:
electric motor + VFD + ~15 kWp solar + hybrid inverter + battery.

3-phase connection hai par light aati-jaati rehti hai, isliye system ko
power cut me bhi chalna chahiye (battery backup ke saath).

Aap turnkey (supply + install + commissioning + net-metering) ka quote de
sakte hain? Pura technical spec (RFQ) bhej raha/rahi hoon. Pehle ek site
visit kar lijiye, phir quote bhej dijiye.

Kitne din me kaam complete ho jayega aur 5 saal AMC ka rate bhi bata dijiye.
Dhanyavaad.
```

## What to attach / send
- `RFQ-installer-quote-request.md` (export to PDF or paste into the chat/email)
- Photos of: the sawmill, both engines, the belt-pulley drive, the roof/shed area, and the electricity meter/connection.

## Before signing — quick sanity checks on the winning quote
- Inverter is a **true 3-phase hybrid** that runs in backup mode (not a grid-tie-only unit).
- Battery is **LFP**, 10-yr warranty — **reject lead-acid**.
- Modules are **ALMM-listed** (needed if you ever want net metering/subsidy).
- Net-metering + CEIG (if needed) is **in their scope**, not yours.
- They did a **site visit** and re-matched the **pulley ratios** for motor RPM.
- 5-year **AMC rate** is stated separately.
